Mississippi contains one of the few statutory openings in the region written specifically for a project like ours. HB 2001 (2024) requires publicly owned generating facilities to satisfy at least two of three criteria — grid resiliency, fuel diversity, or carbon capture. A carbon-captured biomass facility addresses all three.
The storage side is less settled. Class VI is federal, and the state framework for CO2 storage and custody needs to be confirmed for a specific project rather than described in general terms. We would rather say that plainly than dress it up.
Scope and status
Mississippi — regulatory and incentive summary, current as of 2026-11-21. Provided for discussion only — not legal, tax, engineering or investment advice. Statutes, agency positions and incentive terms change, and programme availability turns on project-specific facts. Confirm every item with the agency named before relying on it.
How a project is regulated here
Class VI storage permit
Federal permitting U.S. EPA, Region 4
The EPA implements Class VI. The Mississippi State Oil and Gas Board holds primacy for Class II, so injection expertise sits with the state even where the Class VI permit does not.
Source: U.S. EPA, UIC primacy status · https://www.epa.gov/uic/primary-enforcement-authority-underground-injection-control-program
Pore space ownership
Under review Ownership and unitisation route to be confirmed for a specific project.
Mississippi has extensive oil and gas unitisation precedent; whether and how it reaches CO2 storage should be confirmed with the Oil and Gas Board.
Source: Under review
Long-term custody
Under review Long-term custody framework to be confirmed.
Source: Under review
State storage programme
Mississippi State Oil and Gas Board
A state storage framework has been under consideration; confirm current status before relying on it.
Source: Under review
Utility and offtake framework
Vertically integrated and rate-regulated
Mississippi HB 2001 (2024) requires publicly owned generating facilities to satisfy at least two of grid resiliency, fuel diversity or carbon capture. That is a statutory opening for a carbon-captured generation project that few states offer.
Source: Mississippi HB 2001 (2024)
Who you will be dealing with
| Body | Role |
|---|---|
| Mississippi State Oil and Gas Board | Injection and storage oversight |
| Mississippi Public Utilities Staff / PSC | Utility regulation |
| Mississippi Development Authority | Economic development and incentives |
Working in Mississippi
If you are developing a project here — as a state agency, a university, an operator, a service company or an investor — the useful first conversation is about the specific site and the specific counterparty, not about the technology in the abstract. We will tell you what we know, what we have not yet confirmed, and which of the two matters more.