Texas became a Class VI primacy state in 2026, so the Commission now permits storage as a state function while it continues to run the largest Class II programme in the country. The pore-space position is settled at the Supreme Court, which removes a category of risk that still exists elsewhere.
The utility framework is the opposite case to Alabama and Georgia. ERCOT pays energy, not capacity, so firm behind-the-meter generation is valued on a different logic — a project that looks marginal under a capacity-payment model can look different here. Long-term custody has no state backstop, and should be priced rather than assumed.
Scope and status
Texas — regulatory and incentive summary, current as of 2026-11-21. Provided for discussion only — not legal, tax, engineering or investment advice. Statutes, agency positions and incentive terms change, and programme availability turns on project-specific facts. Confirm every item with the agency named before relying on it.
How a project is regulated here
Class VI storage permit
State primacy Railroad Commission of Texas
Texas received Class VI primacy in early 2026, so storage permitting is a state function. Expect the Commission to build out its Class VI caseload alongside its existing Class II programme.
Source: U.S. EPA, UIC primacy status; Federal Register final rule · https://www.epa.gov/uic/primary-enforcement-authority-underground-injection-control-program
Pore space ownership
Surface owner owns the pore space, confirmed by the Texas Supreme Court.
The Texas position is comparatively settled, which helps, but a project still has to assemble pore space across a tract large enough for a CO2 plume and its area of review.
Source: Lightning Oil Corp. v. Anadarko E&P Onshore LLC (Tex. 2017)
Long-term custody
Under review No state assumption of long-term custody established.
Long-term liability stays with the operator or its successor unless negotiated. Price this into the project rather than assuming a state backstop.
Source: Under review
State storage programme
Railroad Commission of Texas
The Commission administers Class VI injection and the state's CO2 storage framework.
Utility and offtake framework
Competitive wholesale market (ERCOT); PUCT regulates
ERCOT's energy-only market has no capacity payment, so firm behind-the-meter generation is valued differently here than in a vertically integrated state. This cuts both ways for a BECCS project.
Incentives worth testing
Each of these is a starting point for diligence, not a conclusion. Availability depends on the specific project, the county, and the timing of the application — several incentive programmes require approval before construction or purchase begins.
Jobs, Energy, Technology and Innovation Act (JETI)
Property tax incentive for qualifying projects, successor to Chapter 313, administered through school district agreements.
Source: Texas JETI Act (2023)
Who you will be dealing with
| Body | Role |
|---|---|
| Railroad Commission of Texas | Class VI injection and storage oversight |
| Public Utility Commission of Texas | Utility and market rules |
| Texas Commission on Environmental Quality | Air and water permitting |
Working in Texas
If you are developing a project here — as a state agency, a university, an operator, a service company or an investor — the useful first conversation is about the specific site and the specific counterparty, not about the technology in the abstract. We will tell you what we know, what we have not yet confirmed, and which of the two matters more.